Source & Supply
Browse verified material inquiries and company products
Couplers (Mechanical Splices)
UnlockMechanical couplers for rebar splicing in column connections. Type A and B per ACI code. Approx 2500 pieces various sizes 16mm-32mm.
Sanitary Solutions
UnlockComplete sanitary ware package for hotel - 120 rooms. Toilets, basins, faucets, shower sets, accessories. Mid-luxury commercial grade with 5-year warranty.
Blast Proof Glass
UnlockBlast-resistant glazing for government facility windows. Laminated tempered with anti-shatter film. 32 panels various sizes up to 2.4m x 1.8m.
Roof Hatches & Floor Hatches
UnlockRoof access hatches and floor access panels for maintenance. 6 roof hatches (1200x900mm) and 12 floor hatches (600x600mm). Aluminum with insulation.
Toilet Cubicles & Lockers
UnlockToilet cubicle partitions and changing room lockers for sports facility. 24 cubicles + 60 lockers. Moisture resistant HDPE panels, stainless hardware.
Swimming Pool Waterproofing
UnlockPool waterproofing membrane for residential compound. 3 pools - main, kids, and lap pool. Total water surface area 450 sqm.
Rebars (Steel Reinforcement)
UnlockSteel rebars Grade 60 for villa compound foundation and structure. Various diameters 10mm-25mm. Approx 180 tons total.
Extraction Fans
UnlockIndustrial extraction fans for kitchen ventilation in restaurant complex. 8 units, high capacity, with grease filters and fire damper integration.
Waterproofing System
UnlockComplete waterproofing for rooftop and podium areas. Liquid applied membrane + reinforcement. Approx 3200 sqm total area.
Expansion Joint Covers
UnlockExpansion joint covers for large shopping mall floor and ceiling. Aluminum with rubber insert, various widths 75mm-150mm. Total linear meters approx 600.
Terrazzo Tiles
UnlockTerrazzo floor tiles for hotel lobby and common areas. Premium quality, custom color matching required. Approx 800 sqm.
Fire Curtains
UnlockNeed fire-rated curtains for a commercial tower lobby area. Must comply with Qatar Civil Defense standards. Approx 12 openings, varying widths.
Blast Doors
UnlockBlast-resistant doors for utility building. 4 doors, 2-hour fire rating + blast resistance per project specs.
Smoke Ventilation System
UnlockSmoke vents and ventilation for basement parking levels P1-P3. Automated smoke extraction with control panel integration.
Epoxy Flooring
UnlockIndustrial epoxy flooring for warehouse facility. 2500 sqm area. Anti-slip, chemical resistant, 3mm thickness.
